Ok, here we go. Part two of An Architect’s Process. In part one I talked about the steps to signing a contract and what I think are the 3 essential steps in working through that part of the process. And now that we’ve worked through the project details, our proposal has been accepted and the contract has been signed, it’s time to get into the meat of the project.
Any residential project, whether it’s a new home, remodel or addition, has 3 essential parts: the Site, the Building, and the Site and the Client. You have to understand all 3 in order to create a home that the client won’t want to sell in 5 years. So, what do we start with? We’ve got a contract, probably a retainer, it’s time to put lines on a page, right? Wrong. The first part of any project once you’ve been hired is RESEARCH. And not just a little either. You need to know your client a little better than just the first few meetings. You need to find out how they live, what do they do for a living, basically you build a friendship. You also have to know the site. You need to go there, see it, smell it, touch it. For me that is where it begins:
Building Site
Understanding the building site is not really easy. You have to go there. You have to be there, walk in the dirt and mud, see how the sun plays through the trees (if there are any), or if there’s a strong prevailing wind that can be used or maybe needs to be shielded, is there a body of water nearby, etc. Pictures speak a thousand words, but no words can ever duplicate the experience of physically being in a space. Your mind will take it all in and, if you’re good at what you do (I am), then that experience will influence your design in a profound way.
The site that I am currently working with is large – a 10 acre parcel with an additional 12 behind it for views. The building site the client’s chose is an amazing one. The site starts low at the street and begins to rise in these rolling hills before dipping down to a natural stream and then rising again in more rolling hills. One of those hilltops is the site for our design. The drive will come in along the East edge of the property and then cut in and rise up to the garage, which will be mostly concealed by existing trees that will remain. The view north and east will be mostly wooded but with a view of the stream down below.
The property faces North and thanks to the heavily wooded site almost all of the sunlight will be filtered through the tree canopy during the spring and summer. During the fall and winter light will be more direct, but not enough for passive heating. Given these two factors, our opportunity and need for windows goes up dramatically, which is just what the clients want. I would not have known any of these things if I had just researched the property via the internet and Google Earth. I wouldn’t know how quiet it is just inside the tree line or how a mere 50′ south makes a big difference in terms of noise from the road. These things have to be experienced.
So, what have we talked about? We talked about the important steps to signing a client and a new project. We talked about how important it is to represent yourself well, to talk to your client, understand what their wants and needs are for their new home or remodel, and to be upfront about project costs. And today we discussed the site, which is an essential first step in the design process. Even if you’re working on a remodel or addition, you have to put yourself in the space and understand what the environment is like with all 5 of your senses in order to begin to formulate a solution to the clients design problem.
Next time we’ll talk about the building and the client, since they really go hand in hand.
Cheers.